City’s roadway resurfacing program starts this week
MEDICINE HAT, AB – It’s another sign of summer: construction on city streets.
The City of Medicine Hat will begin its annual roadway resurfacing (overlay) program on Friday, June 16. Dunmore Road, Carry Drive and First Street SE are among the roadways to be resurfaced this year.
The work will start with infrastructure repairs to catch basins, concrete curbs and gutters, and sidewalks adjacent to the roadways. Roads will then be milled to remove the top levels of asphalt and repaved.
All the work is expected to be done by Aug. 31, though schedules are weather dependent and subject to change.

