Trio of city construction projects starting Sept. 11
MEDICINE HAT, AB –
Three City of Medicine Hat construction projects are scheduled to start today.
At the Lions Park baseball diamond, work begins on an accessible asphalt trail to connect the eastern edge of the diamond area to the Strathcona parking lot. The city says it will create an easily navigable path for people in wheelchairs or other mobility limitations.
Work is also starting on the rehabilitation of the culvert and asphalt trail at Ross Glen Coulee. A drainage trench, tile drain and a corrugated steel pipe culvert will be added at three points to the drainage system and overall structural stability.